BLOG INVESTM@N

Our MENTIONS

Progress on Bangkok’s new urban planning, on the way to become,

People of Bangkok will be happy to know that there has been progress on the revision of  Bangkok’s Outline City Planning, which will be announced at the end of 2021. In addition to the plan’s primary objective, increasing the efficiency of land’s usage in the city area according to our previous article https://bit.ly/365hl2M, today Invest:MaN will update our readers more information regarding the topic provided by the city’s authority. The next step of becoming an ASEAN metropolis. Major plan to move the current electrical cable system underground.         The wait is over. For the first time, Bangkok has a plan to bring the power cable down underground, in order to enhance the city’s beauty and landscape. Bangkok Metropolitan Planning and Development Office revealed that this public utility project is part of the latest urban outline planning. At the moment, lists of roads mentioned to get a facelift can be found below. Chaengwattana Rd., Klong Prapa – Khlong Bang Khen, Ratchayothin Intersection – Ngamwongwan Road, Lat Phrao Intersection – Ratchayothin Intersection, Lat Phrao Intersection – Ratchadapisek Road Rama VII Bridge – Tha Phra Intersection, Ratchadapisek Road – Srinakarin Road, Pracharat Road 1 to Techawanit Road, Pracharat Road 2 to Thanat Road, Samsen Road – Rama V Road Rama 6 Road, Samsen Road Project, starting from Ta-Harn Road until converging with Khor Chai Si Road, Samsen Road Project starting from Nakhon Chai Si Road until it converges with Luk Luang Road.  Area around the Chitralada Palace, starting from Ratchawithi Road, Sawankhalok Road, Sri Ayudhya Road, until it meets Rama V Road. Din Daeng Road – Vibhavadi Rangsit Road, Charansanitwong Road – Arun Amarin Road, Rama 8 Bridge to Prajadhipok Road, Lat Phrao Road – Ramkhamhaeng Road, Vibhavadi Rangsit Road To Khlong Samsen And Victory Monument To Dindaeng Triangle – Vibhavadi Rangsit Road, Phetchaburi Road – Srinakarin Road, Sri Ayutthaya Road – Din Daeng Triangle, Prannok Rd., Phetchaburi Road, Chidlom Road, Petchaburi – Ploenchit, Angri Dunant Rd. Ploenchit – Sarasin Soi Sukhumvit 63 – Ramkhamhaeng Rd., Wireless Road, Ploenchit – Rama 4, Prajadhipok Rd., Phra Pok Klao Bridge – Wongwian Yai, Sarasin Ratchadamri-Witthayu Rd., Rama IV Rd. Rama 4, Somdej Phra Chao Taksin Road Wongwian Yai – Ratchadaphisek and Charoen Rat Rd.         The purpose of this project is to improve the landscape in the urban area, which serves as the center of the city’s economy and tourist attractions of Bangkok. Enhancing the clean look of the city without the existing electric wires and poles along the streets and roads, to raise the level of being a livable metropolis, also more appealing for visitors.  For example, look no further than our fellow neighbors in ASEAN, Singapore, a country which is well ahead and developed in this area. Apart from improving the overall appearance, the plan also increases the safety of people. We have witnessed numerous accounts of accidents caused by having electric cable systems on the ground. Credit: Prachachat

Read More »

Nakhon Nayok – Saraburi Chalong Rat Highway Extension Project

            Sooner than later, the people living in the south and east of Bangkok will no longer need to take a detour to Wang Noi as a route to the Northeast (I-San) provinces. An extension of the Chalong Rat Highway project is now being considered. Currently, the highway ends at the Eastern Wong Wan Road, which would lead to the north direction all the way to Wang Noi. Travelers will then have to turn right onto Mittraphap Road to reach Saraburi – Northeast route, where traffic gets congested due to the number of buses from the east and from Suvarnabhumi Airport, combining with cars flowing from the north and west. This project should ease the traffic problem once completed, especially during the long holiday season where people tend to get away from the city to visit their families in the countryside. The extension will serve as a short-cut straight to Saraburi for cars from the east.             The Highway Authority of Thailand is responsible for this project, which has already been approved and is in the process of signing a contract. Work by researchers is gathering pace in which survey and design of the project have already been made. The starting point of the project is at the Chalong Rat Highway at Chatuchote checkpoint, connected to the Eastern Wong Wan Road.              For the project details, the total distance is approximately 104.7 kilometers, an elevated highway of 6 traffic lanes (3 lanes for each direction), connecting with the Chalong Rat Highway at Chatuchote checkpoint, on the outer Wong Wan Road – East Bangkok (Kanchanaphisek Road). Several major educational departments and institutions stand to benefit from the project including Srinakharinwirot University, Institution of Physical Education, Institute of Nuclear Technology, Chulachomklao Royal Military Academy and industrial estates nearby such as Nong Khae Industrial Estate, Viharn Daeng Industrial Estate and Hemaraj Industrial Estate. In terms of the positive effects on urban communities, expansion of communities nearby namely Ongkharak district and Ban Na District of Nakhon Nayok Province, Nong Khae District, Wihan Daeng District and Kaeng Khoi district of Saraburi Province, are expected due to the transportation convenience. There will be 9 access points of this project; The starting point of the Eastern Wong Wan Road project Hathairat Road intersection, Minburi Lam Luk Ka Road intersection Intersection at Tor Lor 3001 Road Intersection of Rangsit-Nakhon Nayok Road, Tor Lor 305 Suwannasorn Road Intersection, Tor Lor 331 Number 6 Motorway intersection The intersection of the Saraburi roadways, Tor Lor 362 The end of the project at Mitraphab Road, Tor Lor 2 Credit : Expressway Authority Of Thailand.           Opportunities for expansion in remote residential communities away from the city are high due to improved transportation convenience. These communities include Ongkharak district, Ban Na district, Nakhon Nayok district, Wihan Daeng district, Nong Khae district, Kaeng Khoi district in Saraburi Province. The urban prosperity around these areas will result in a further rebound in land prices.           Obviously, the land in the area near all the access points would have directly benefited from this project as they could potentially be utilized at highest and best use. Industrial sector will have its transportation capability improved, while the expansion of nearby communities will only allow and attract investors who seek investment opportunities. Invest:MaN will take you to explore the land prices which will be affected by this project.           The project will be constructed parallel to the Wang Noi-Korat Motorway which is expected to be completed and ready for use by the year 2022. Meanwhile, the feasibility study has already been done for this project in order to determine the route. Currently, the project is waiting for issuance of a Royal Declaration Decree of Expropriation for State Land Ownership. Construction is expected to begin in the year 2022 and completed by the year 2025, wait a little longer, another 5 years.            Invest:MaN has identified the 2 most intriguing areas which will appeal to investors who are searching for land with high investment and usage potential where prices will continue to grow, namely the area at Suwannasorn Road Intersection, Tor Lor 331. The area is occupied mainly by industrial estates which still have room for expansion. Moreover, the Kaeng Khoi area will serve as a center of this new project and the high-speed train station which will be the transportation hub in that area. Thus, in 5 years time, investors will have to move quickly to take advantage of the new rising opportunities within the area.

Read More »

Charitable yet Profitable Investment Opportunities

  This is a great opportunity for investors who are looking to convert cash into return for investment rather than saving money in the bank for small gain. The COVID-19 pandemic has significantly impacted the tourism industry in Thailand since the breakout and are expected to remain until the foreseeable future. Look no further than hotel & resort and apartment & condominium projects as businesses which were most heavily affected in the tourism sector.              According to a survey by Invest:MaN, many parties in the hospitality industry have already looked to sell their businesses officially. Some are weighing their options between selling or waiting for any potential stimulus package from the government. As a result, thousands of businesses are available all over the country, presenting a golden opportunity for the investors looking to invest in the hospitality sector.             However, instead of an investment for the total takeover of one business, Invest:MaN would like to deviate investors’ attention to supportive & sustainable investments for these hotel businesses that desperately needed funds to survive this crisis. By investing for a small share of businesses, making sure that businesses are able to continue, not only investors will receive profitable returns but also a feel-good factor playing a part in helping others during the time of hardship. We would like to call this, “charitable yet profitable investment”.             Invest:MaN proposes an investment model similarly to accepting mortgages for sale, with rental period up until 3-5 years. However, investors must also consider the future business plans proposed by the business owner to ensure that the investment will guarantee profit from the increase in business’s value. Alternatively, the riskier option could be injecting a lump sum of money for the owner to manage, without any guarantee payout for the investment, considering it as a soft loan when compared to the risk free rate of 3-5 year government bond with interest rate of +2%. Tips for investment in hotel & hospitality business to consider when opportunity presents itself. General location is the first factor to be considered. It is very important when looking at investment on a big picture. Location of hotels include, a primary or secondary city, tourists attraction spot and how they are appealed to visitors; historical value or scenery nature for example.  Occupancy rate is an information that investors do their own research on the tourism website. One which implies how well the business is currently doing. Hence, the numbers can be studied and compared with one another when weighing investment options. Specific location is a factor that must be considered in terms of location according to the terrain, public facilities, vicinity, magnetism elements, special features such as the sea, mountains and etc which draw in visitors.  Type of hotel license should be checked. Licenses are usually categorized into four categories: Type 1 hotels mean hotels that provide rooms only; Type 2 hotels refer to hotels that provide rooms and restaurants; Type 3 and 4  hotels refers to hotels providing rooms, restaurants and facilities such as auditorium and meeting rooms to accommodate special events along with the catering service such as according to hotel regulations. Investors should be aware of the type of business according to their licenses. Changes and retention of license in order to maintain a continuous operation must not be overlooked by investors. Physical age of hotels tells investors how much capital is needed as part of  improvement, renovation and rebranding costs. Land Per Key is a variable used in determining the use of land per room. The ratio suggests how dense the use of the space is congested and if there is any space left to expand the hotel services. Hotels located in city areas normally have high density, while resort-style hotels in the provincial and tourist areas are likely to have more space. Price Per Key is the quoted price per room. The number is calculated by dividing the total selling price by the number of rooms available in a hotel. Initial rate of return (Yield) can be computed after price per key and the occupancy rate based on the market criteria are identified. Investors can estimate the initial rate of return based on three scenarios; best, fair, and worst. Investors will understand the appropriate yield to anticipate which will lead to a final investment decision. The appropriate nature of hotel investment may vary according to personal preferences of each investor which can be summarized as a guideline as follows. Stock investment involves total purchase and selling for profit gain after a short holding period. Occasionally, distress hotels become available for grab at bargain prices through auctions held by the Legal Execution Department. Nevertheless, investors must have an understanding on how to take advantage of the situation. These types of acquisition does not consider the factor of ongoing concern, therefore, certain expenses incurred from taking over the business which are excluded from final price as obtained from auction. Depository investment works similarly to a general lending scheme with collateral as an insurance for investors, to avoid pursuing litigation on mortgage if the debtor fails to pay installments. Investors obtain the right of ownership when in default of payment in certain. However, this investment method comes with a higher cost of borrowing than mortgage trading, therefore, a full ownership transfer fee has to be paid. Business owners, in this case, the debtors, will have a heavy financial burden due to a high borrowing cost, less the actual fund for businesses. Charitable yet profitable investment is the new investment approach Invest:MaN suggests. Investors will be rewarded financially as well as good peace of mind. Playing part in helping those struggling business owners carrying on their lifetime work restores investors’ consciousness which is usually financially driven.           -The investment which would serve best to business owners’ gain aree one which low borrowing costs, to maximize actual funding to genuinely stimulate businesses.           -Including additional terms related to business plans in which business owners and investors have

Read More »

Areas in Bangkok that are prone to repeated floods.

 We have seen the issue of flooding becoming a hot topic again. Hence, Invest:MaN would like to discuss more about the flooding, same old problem in Bangkok. It feels like Bangkokers has been dealing with this forever. One is fair to say that whenever there’s rain, there’s flood, the only question is how bad. Therefore, before buying real estate; houses, condominiums, and etc, buyers should first know which area in Bangkok is prone to flooding. It helps the decision to buy a home for living or an investment property, such as vacant land, provide peace of mind for residents or investors, who may experience a loss when property prices fall due to water problems.   Ever wondered why the flood problem in Bangkok persists?         According to a source from TQM, Dr. Sirilak Chomchuen, Chairman of the Sub-Committee of Water Resources Engineering Institute of Thailand (EIT) stated 3 factors that caused the Bangkok floods. The excess water mass from the northern region, caused by rainfalls which flows into Bangkok as a passage before draining into the sea. The rise of sea level which forces a fair amount of water to flow back into the drainage pipes combined with the city’s lack of water catchment / receiving areas which could help relieve flooding. Many areas in Bangkok are lowlands, therefore, only slightly above the sea level. Moreover, these areas usually look like a basin in nature whereby rainwater is easily trapped on the roads.         The above problems are only made worse by the persistent problem of public littering. Streetwalkers, households, shops and restaurants tend to dispose of garbage and food debris on the street or roadside. These waste are washed aways when rain comes down and ends up clogging up the drain pipes which are relatively small, not designed to handle the long-period of heavy rain Bangkok usually experiences today. Let’s take a look at which parts of Bangkok are prone to flooding         12 districts to avoid due to the past record of being flooded repeatedly, including:  Taling Chan   Thaweewattana  Bang Phlat   Bang Khae  Phasicharoen   Nong Khaem  Don Mueang   Bang Khen  Sai Mai   Laksi  Chatuchak   Khlong Sam Wa Bangkok Drainage Office also identify 14 roads that often encounter repeated floods, including: Chaengwattana Road, from Khlong Prapa to Khlong Prem Prachakorn Ratchadaphisek Road, in front of Bangkok Bank Phaholyothin Road, in front of Amon Phan Market and Kaset Intersection Pracharat 2 Road, Tao Poon Intersection Area Rajavithi Road, in front of Suan Dusit Rajabhat University and the foot of Krungthon Bridge Phaya Thai Road, in front of the Department of Livestock Development Sri Ayutthaya Road, in front of Phayathai Police Station Chan Road, from Soi Bamphen Kuson to Yan Nawa Post Office. Suan Phlu Road, from South Sathorn Road to Nang Linchi Road Sathu Pradit Road, at Chan Road Intersection Suwinthawong Road, from Khlong Sam Wa to Khlong Saen Saeb Phetkasem Road, from Thawi Watthana Canal to Ratchamontri Canal Soi Village Setthakit, from Petchkasem Road to Kanchanaphisek Roundabout Bang Khun Thian-Chai Tha-le Road, from Rama 2 Road to Sakae Ngam Canal     12 districts that are relatively safe from flooding, suitable for living and investing, including: Thung Khru   Raj Burana  Khlong San   Pom Prap Sattru Phai  Ratchathewi   Wang Thonglang   Phayathai   Watthana  Sathorn   Suan Luang  Pathumwan   Bangna Thank you for the map data from GISTDA and the Bangkok Drainage Bureau for the illustration of map datas. Credit  : TQM

Read More »
Investment opportunity on landlocked land

Investment opportunity on landlocked land

  When it comes to the topic of landlocked land, the general public usually has a negative investment view. Landlocked land is often seen as an invaluable asset which carries no gain but burden, a risky asset to be holding on. Therefore these lands become unwanted. However, smart investors have to view this differently from the general idea and see this as another investment opportunity, in which low investment may result in high profit. In other words, it is considered as a high risk – high return investment option. With the basic knowledge that we have prepared below when evaluating the prospect of investing in landlocked land, the decision can be made reasonably. Investor preparation: Learn to inspect the cadastral map/land map provided, the Land Department – Investors will need to have the knowledge and expertise in the inspection of the land map made available at the Land Department to prove the actual position of the land by themselves. An in-depth review is shown on the right picture. Learn to perform a quick preliminary inspection of the land map for accessibility of the land, available online – Investors need the tools to be able to track land positions and screen the unimportant information. Learn how to run the valuation model – investors have to make their own decisions based on the behavior or trend of the land price. In this scenario, it would be appropriate to compare the value of landlocked land located into the street with another landlocked land located next to the main road. So where can we find these landlocked land?          Landlocked land is not easy to find. Therefore, when one comes around and an investment opportunity presents itself, the decision must be made quickly and thoroughly. There are ways to search for these lands. Look for the general property sale announcements – Announcement for sale of both vacant land or land with buildings. Be on a lookout for sale announcement signed along any main roads that we are interested in. When we identify a plot of land next to the road which is available for sale, we have to look further at nearby plots to see if they could be landlocked. If there is, we can proceed to negotiation with the owner of the lands. Look for the announcement of inner plots of land up for sale – This method can be viewed from an announcement or by inquiring the locals who may be aware of available land for sale. Most of the time, inner plots of land can be identified from the sale of a bigger plot of land. By looking at the land map, we can then determine the route for accessibility of the land. Look for the auction sale announcement by the Legal Execution Department -This is the source where you will find many lands and properties available for sale through auction. Hence, there is a good chance you will be able to find landlocked land up for grabs while others tend to overlook. Before entering the bidding process, you must study the possibility of finding a route which will serve as entrance-exit of the land. Moreover, we have to take into account the cost of acquiring this entrance which will only accumulate to the total cost of purchasing the land. The target investors you are looking to sell to for profit gain have to be identified, usually, land development companies. It would be our advantage if we could estimate the approximate project development cost for these firms allowing us to propose an appropriate selling price which is fair for both parties. Lastly, we can suggest the most appropriate and convenient accessible route as entrance and exit to be acquired by applying for easement in the next step. Follow the update on new expropriation project The expropriation line related to state projects such as construction of a new road. These new roads could potentially open up opportunities for land with no access to the main road. Investors with in-sight updated information on these ongoing and upcoming projects will have a better chance of exploring and buying with hope of making profit in the future once the project is complete.

Read More »
Investment in land right documents, Nor Sor 3

Investment in land right documents, Nor Sor 3

          To invest in land by trading the title document, Nor Sor 3, also known as “Black Garuda”, investors must be a risk taker. Nevertheless, investors could be in for huge benefits gain if everything goes as planned. A good plan is to obtain a land right document in terms of the title deed to be issued by the department of land before selling for profit. Having a good exit strategy is always crucial from an investment perspective.           Land with Nor Sor 3 document is meant for the owner to utilise and make a living out of the land. Hence,the land boundary and the land map can be unclear. To improve accuracy, the owner or representative is required to point out, as well as references to neighboring land. The risks that arise with the Nor Sor 3 land at the investment level are: Documents may not be listed in the land department’s directory. The exact land location may not match the tenure. Part of the land may be missing, therefore inaccurate to the land document.          These issues serve as a checklist for investors to rely and review with the potential seller when looking at any purchase. This helps fasten and smoothen the decision making process. Any question arising from the checklist can then be followed with the seller. This also gives the investor a broad picture if the deal is worth carrying out when taking into account all the problems they may face and time consumption.  To certify the land documents at the land department along with the land plot that appears in the aerial photographic map, Nor Sor 3 can only be issued if the origin of the aerial photographic map is provided. Check if the land survey has ever been conducted in the past to indicate actual size of the land. If not, then assign a request for a survey. This is because investors want to know the actual size of the land to calculate the payment which calculated price per rai. Check with the local maintenance tax system or new property tax at local authorities such as the district municipality office to find out if the property is in the tax system. Is there a tax payment in the past ? Any overdue amount ? Who is the owner by law ? Check out the forest area which can be done by ourselves first. Once the location of the land is pointed in google maps, we can use that coordinate position to search the forest zone on the DSI map. If the land is not located in a forest area, title deeds can be issued. However, if the land is in a forest area, more in-depth examination procedure has to be carried out before applying for title deed. Come up with a plan after acquiring ownership of land. As mentioned before that land under Nor Sor 3 is meant for agriculture, so those who own it must make use of the land. If the land is abandoned or left unused, higher property tax rate will have to be paid by the owner. More importantly, the owner can lose possession of the land if other people come into the land and after using it within a year. This problem happened on many occasions, therefore, investors must be careful.            When all 5 results are satisfactory, it is time to negotiate the price for the most satisfactory price. It is the nature of the investor to buy at least 20% below the market price. After the ideal price is negotiated, investors should start binding on the deposit agreement which must be paid after the appointment of a land survey date is clearly determined. Investors also have to ensure that the terms of withdrawal from an obligation is present in the agreement, should they decide to exit the contract without any claim legal action which could be made against them

Read More »
Outline of the new Bangkok city plan - Lifting Bangkok to become the metropolis of Asia within the next 20 years!

Outline of the new Bangkok city plan – Lifting Bangkok to become the metropolis of Asia within the next 20 years!

The new city plan aims to make better utilization of available space for each classification of zoning area in order to support the development of “compact” city. The plan is scheduled to become effective by early December 2020. The biggest changes we will see in the proportion of each type of land use when compared to the previous plan issued in 2013 are as follow: Reduction of less populated residential area (from 15% to 5%) Increasing of medium – high populated residential area (from 15% to 22%) Slight increase in area for commercial purposes Let’s have a look at some of the outcomes we can expect to see. Better traffic congestion in the city – There is a measure to reduce the number of parking spaces according to the regulations of Bangkok. the new building control regulation will enforce buildings located within 500 – 800 meters of the train stations to reduce parking spaces by 25%, encouraging the use of public transportation instead. Creation of public space – Extra floor area ratio (FAR) is given to buildings that are willing to develop open spaces such as public parks to support the city’s community. Expansion of real estate projects – Large residential and commercial projects under specific categories will be allowed to build more buildings, as the floor area ratio can be increased depending on the land’s size of the project. a.High-density commercial and residential projects with land size over 20 rai b.Medium-density residential projects with land size over 50 rai c.Low-density residential projects with land size over 100 rai * Consistent with the adjustment of the proportion of land use for each type As you can see, this plan will directly affect both state and private agencies involved in housing as well as real estate development companies. Therefore, Prospec Appraisal provides a wide range of services to meet this new regulation for real estate development companies and agencies in need of assistance such as project feasibility study, site selection and etc. Please visit our website for more details https://www.prospec.co.th/en/article/categories.php?id=5&name=Valuation%20Additional Credit – source: www.tooktee.com , link: https://bit.ly/3gR1QyL

Read More »

The problem of neglecting contractors.

Contractors leaving or abandoning jobs seem to be cliche stories today. Customers are left hanging as contractors run off immediately after the constructions complete or not even so. Nevertheless, one cannot simply avoid hiring contractors for construction services as it is a specialized job in which expertise is required. We ourselves do not have any knowledge of construction. The contract agreement proposed by contractors usually includes the term of annuity payment schedule. In other words, up front payment before work is done, one of the main causes leading to them abandoning jobs. Today Invest:MaN recommends some quick considerations in building your own home or property. Step 1: Before construction begins Review the plan thoroughly. Pay close attention to the BOQ which will include a list of materials stating the amount of material, unit price. Separate the cost of goods from the labor cost if its match with the construction contract price as specified in the contract. Any changes regarding the details of the job should be agreed in writing and updating in the contract as a safeguard. This will come in handy when clients wish to adhere to the additional costs reduced by the BOQ. In the case of using bank loans, payment installments should be made according to loan payment schedule. Do not allow the contractor to take over the management of financing of the job. Step 2: During construction Clients without any knowledge of construction should procure someone with appropriate knowledge as consultant or even acting on one’s behalf to oversee the entire length of the construction operations. Part of the required construction materials clients wish to procure themselves should be agreed in the BOQ attached to the contract. However, keep in mind that part of the contractor’s expense also incurred from coordination with their vendors or sub-contractors, hence, it is only fair to have sympathy for them and be reasonable when attempting to cut cost through self effort on finding supplies. There is no perfect way of defining the disbursement of the job. Usually, it can be determined by measuring the amount of work in %, which requires specialized skill as a person with direct construction experience. Therefore, having a specified consultant to help take care of is advised. Step 3: After construction finishes. In an event where contractors abandon the jobs or refuse to put in extra effort as according to the client’s wish as the construction is completed, steps must be prepared to bring the matter to court’s attention. According to the Invest:MaN’s experience in such circumstances, the clients will be asked to prepare appraisal reports to be used as a written reference from certified public appraisers. The report must state the price estimation of the job which will then be used in the litigation decisions. Appraisal price according to the time of construction halt and the % completion of the job. Therefore, in an event like this, the smart move would be to appraise the job value to-date before hiring another contractor to finish the remaining job right away. The appraisal will become much more difficult when separating the works done of 2 contractors. The process of investigating witnesses is complex and will consume more time. Invest:MaN hopes this will be helpful for people who are looking to hire contractors for their constructions.

Read More »
ประเมินราคาโกดัง

ประเมินราคาโกดัง

ประเมินราคาโกดัง : โกดังเป็นส่วนหนึ่งของภาคธุรกิจโลจิสติกในประเทศไทยเราจะมี Market Rent ของค่าเช่าโกดังอย่างหลากหลายประเภท ขึ้นกับทำเลที่ตั้ง กลุ่มเป้าหมายสินค้าก็เป็นตัวแปรตัวหนึ่…

Read More »
Top